The calendar shows two reports called “PMI” for the US: one from ISM, the other from S&P Global. They have similar numbers, a similar scale and sometimes a completely different message. If you don’t tell them apart, it is easy to draw the wrong conclusion in the quarter of an hour before ISM.
What it is
The S&P Global PMI is a survey of purchasing managers at American companies, run by S&P Global. It has three main numbers:
manufacturing PMI,
services PMI,
composite PMI (the combined picture).
The scale is the same as in ISM: above 50 = growth in activity, below 50 = a decline.
The report comes out in two versions:
preliminary (flash) – about a week before the end of the month, for the current month, 15:45 Polish time,
final – at the beginning of the following month, also at 15:45 PL: manufacturing on the first business day, services on the third, i.e. always a quarter of an hour before the respective ISM.
In daylight-saving weeks (March and the turn of October and November) everything is an hour earlier, i.e. at 14:45.
How to read it
The most important for the market is the preliminary version. It is one of the first pieces of information on what the current month looks like, before hard data comes out. The final version usually changes little and moves the market weakly, because ISM comes out right after it.
How it differs from ISM:
a different sample and different weights – S&P Global surveys different companies, and calculates the manufacturing headline with different component weights,
composite PMI – ISM doesn’t have it; S&P Global combines manufacturing and services into one number,
commentary – S&P Global attaches an economist’s description, often with remarks on prices, employment and business confidence.
Divergences happen and that is normal. Numerical example. Preliminary S&P Global manufacturing PMI: 51.2, i.e. growth. A week later ISM manufacturing: 48.7, i.e. contraction. That doesn’t mean either report is wrong. They measure manufacturing differently. The market usually attaches more weight to ISM, but when both reports go in the same direction, the picture is stronger.
What else to check in the report:
prices paid and charged – S&P Global reports both companies’ costs and the prices companies set for customers. The latter is sometimes closer to what will reach CPI,
employment – an additional piece of the mosaic ahead of NFP,
comparison with Europe – the same morning the preliminary PMIs for Germany, France, the eurozone and the UK come out. They give context on whether weakness is global or local.
Why the market reacts
The preliminary PMI is a quick picture of business conditions before hard data is available. The mechanism is the same as with ISM: stronger activity means better earnings prospects, but also a smaller chance of rate cuts if prices rise.
The typical scale of reaction, however, is smaller than with ISM or CPI. Dow and S&P futures more often make a short move and return to their earlier rhythm. A bigger reaction happens when:
the reading crosses 50 in either direction,
the commentary speaks directly of strong price growth or falling employment,
the market is in a period of big recession or inflation worries.
The dollar and yields follow the picture of business conditions, and gold and Bitcoin – what that picture does to Fed expectations.
What it means for a day trader
15:45 is a quarter of an hour after the Wall Street open, i.e. one of the busiest moments of the day. The release lands in the middle of the first wave of orders after the open and is hard to separate from ordinary open volatility.
In practice:
check in the morning whether it is the preliminary or final version – the weight depends on it,
on days with the final PMI remember that ISM comes out at 16:00; the 15:45 move is sometimes only a warm-up,
after the release see whether the contracts break out of the first-15-minute range or stay in it.
Typical mistakes: confusing the S&P Global PMI with ISM, attaching great weight to the final version, treating a divergence from ISM as a “data error”.
In short
The S&P Global PMI has a preliminary version (end of month) and a final one (start of the next), both at 15:45 PL.
The market attaches more weight to the preliminary version.
It is a different report than ISM – different companies, different weights, possible divergences.
When PMI and ISM say the same thing, the picture of business conditions is stronger.
When the preliminary PMI falls this month, you will see in the “📅 US data and Fed today” bar at the top of the section.